Basin Electric experienced a new all-time high member billing peak in January 2024. This peak surpassed the previous all-time high peak in August 2023 by 429 megawatts (MW).
Elizabeth Erhardt, Basin Electric manager of Member Rates, said the peak demand of 5,130 MW surpassed the previous winter season peak of 4,679 MW in December 2022, as well as the previous summer peak of 4,701 MW in August 2023.
Additionally, this 2024 billing peak is the second largest increase to have occurred between two all-time high peaks. The largest increase between two all-time high peaks took place between 2013 and 2014.
Erhardt said the increase is largely due to the winter storms that swept over Basin Electric’s service territory along with continued increased load growth throughout the membership.
Data pertaining to all-time high member billing peaks is recorded back through the beginning of the 1970s.
Dakota Gasification Company
Headquarters:
1717 East Interstate Avenue | Bismarck, ND 58503-0564 USA
701.223.0441 | 1.800.242.2372
Great Plains Synfuels Plant
420 County Road 26
Beulah, ND 58523-9400 USA
701-873-2100
A subsidiary of:
Basin Electric wants all interested and qualified candidates to apply for employment opportunities. If you are an applicant with a disability who is unable to use our online tools to search and apply for jobs, or who needs other assistance or accommodations, please contact us at 701-223-0441. Please indicate the specifics of the assistance needed or provide your contact information, and a Basin Electric Human Resources representative will contact you. Basin Electric is an Equal Employment Opportunity Employer regarding race, color, religion, sex, sexual orientation, gender identity, national origin, disability, and veterans status.